Simtra BioPharma Solutions Project Greenlight

This aseptic manufacturing and filing facility is a new building that primarily designed to create additional filling capacity for this  CDMO company on their existing site in Bloomington, Indiana. The floor plate is 196’ (east-west) by 384’ (north-south), which is approximately 75,000 gsf at the first floor. The building’s total gsf is approximately 150,000. Building H will have 3 new filling lines: 1 vial line and 2 pre-filled syringe lines. All production will be located on the first floor of the building with lab and office space on the second floor. Building H will serve as a state-of-the-art process, lab, and modern client experience for the site to showcase the client’s dedication to quality. Building H will serve as a new community anchor for the site as it sits on a highly visible road close to the existing main entrance.

Location

Bloomington, Indiana

Size

150,000 sf

Project Principal

Christine A. Hofnagel

Project Manager

Kaitlin O'Brien

Project Architect

Rabia Rana